Level 2 chargers, Tesla Wall Connectors and NEMA 14-50 outlets installed and load-calculated properly.
Confirmed on site before work starts
| Load check and charger consultation | $0 with quote |
| NEMA 14-50 outlet, panel within 15 ft | $450 – $850 |
| Hardwired Level 2 charger, standard run | $650 – $1,300 |
| Long run, trenching or detached garage | $1,200 – $2,600 |
| Charger install with 200 amp panel upgrade | $2,600 – $4,300 |
Free quotes on planned work
| Job | Typical range |
|---|---|
| Load check and charger consultation | $0 with quote |
| NEMA 14-50 outlet, panel within 15 ft | $450 – $850 |
| Hardwired Level 2 charger, standard run | $650 – $1,300 |
| Long run, trenching or detached garage | $1,200 – $2,600 |
| Charger install with 200 amp panel upgrade | $2,600 – $4,300 |
You approve the number before we start. No hourly meter running while someone walks to the truck.
Nights, weekends and holidays cost the same as a Tuesday afternoon. Emergencies are expensive enough.
Breakers, outlets, wire, fixtures and panel parts on board, so most calls finish in one visit.
Drop cloths down, holes patched, boxes and offcuts gone. Your house looks like we were never there.
“Added a dedicated circuit for a hot tub plus a GFCI disconnect. Trenched, backfilled, and you cannot tell they were in the yard. Quoted flat, charged flat.”
Chris B., Birmingham“Office fit-out for a new suite. Twenty workstations, all the data runs, and the lighting. Finished a day ahead and the inspector had zero notes.”
Michelle K., Huntsville“Installed our Tesla Wall Connector in the garage. Checked the panel load first and told us we did not need the upgrade another company insisted on. Saved us about two thousand dollars.”
Priya N., BirminghamA straightforward Level 2 install in Alabama with the panel near the garage usually runs $650 to $1,300. Long runs, trenching to a detached garage or a required panel upgrade push it higher, and we give you the full number before we order parts.
Not always. Many Alabama homes with 200 amp service have room for a 48 amp charger. If your panel is 100 amps or already loaded, we can often fit a load management device instead of a full upgrade, which is usually the cheaper path.
Most Alabama installs are done in three to five hours. Trenching, a panel upgrade or a run across the length of the house can turn it into a full day, and we tell you which one you have before we schedule.
Hardwiring lets most chargers run at 48 amps instead of 40 and removes the outlet as a failure point, which matters because 14-50 receptacles are a common source of overheating. If you may move the charger later, the outlet still makes sense.
Yes. We install workplace and customer charging in Alabama, including multiple units on a shared feeder, bollard protection and network-connected chargers for billing.
Every Alabama city has its own ev charger installation page with local pricing and booking.
Our emergency line across Alabama is answered 24 hours a day, including weekends and holidays. Same rate at 2am as at 2pm.